Thermal cracking prevention

Location: Edenkoben, Germany
Project category: Infrastructure

In March 2022 the consortium Snowless performed at TRIWO AG in Edenkoben a project to prevent preliminary cracking of asphalt in a loading dock. The fast-responding attribute of our ribbons is crucial in this unique solution for energy-saving heating.

heating system loading dock
heating system asphalt